Skip to content
Login

Hero Sections

Landing-page heroes for introducing a product, each ready to copy into your project.

Phone showcase

hero-section-06.tsx

A dark centered hero with a tight Albert Sans headline, Geist body copy, a white button, and an edge-faded marquee of tall phone screens that pauses on hover.

Open full-size preview
Loading preview…
pnpm dlx shadcn@latest add @pastaui-pro/hero-section-06

Selection highlight

hero-section-05.tsx

A centered hero on soft sky blue with blurred orbs: a stacked Manrope headline whose last line sits in a design-tool selection box with diamond handles, a platform icon row, a glossy blue pill button, and a product screenshot that overhangs the section edge.

Open full-size preview
Loading preview…
pnpm dlx shadcn@latest add @pastaui-pro/hero-section-05

Gallery marquee

hero-section-04.tsx

A centered hero on a warm sand background: a tight balanced headline, muted subtitle, gradient-glossed dark button with an outline partner, a small free-trial note, and an edge-to-edge marquee of image cards.

Open full-size preview
Loading preview…
pnpm dlx shadcn@latest add @pastaui-pro/hero-section-04

Workspace showcase

hero-section-03.tsx

A quiet left-aligned hero on a warm off-white page: a two-line headline, muted subtitle, pink and charcoal buttons, and a 16:9 product window below.

Open full-size preview
Loading preview…
pnpm dlx shadcn@latest add @pastaui-pro/hero-section-03

Prompt composer

hero-section-02.tsx

A dark AI-product hero with an animated warm ribbon glow, glass prompt composer with mode, theme, speed, and voice controls, and one-tap suggestions.

Open full-size preview
Loading preview…
pnpm dlx shadcn@latest add @pastaui-pro/hero-section-02

Stats centered

hero-section-01.tsx

A centered hero with a social-proof badge, serif-accented headline, dashed stats row, and a wide media panel.

Open full-size preview
Loading preview…
pnpm dlx shadcn@latest add @pastaui-pro/hero-section-01